i. This Quarterly
Environmental Monitoring and Audit (EM&A) Summary Report is prepared for
Contract No. SPW 07/2020 “Environmental Team for Construction of Yuen Long
Effluent Polishing Plant Stage 1”. Drainage Services Department (DSD) has
appointed Fugro Technical Services Limited (FTS) to undertake the Environmental
Team services for the project and implement the EM&A works.
ii. This is the 2nd Quarterly EM&A Summary
Report for the Contract which summaries findings of the EM&A programme
during the reporting period from 1 July 2021 to 30 September 2021. As informed
by the Contractor, major activities in the reporting period shown in section
1.4.1.
iii. The EM&A methodology
has been effective in monitoring the environmental impacts of the Project and
the effectiveness of the mitigation measures. The data collected were useful in
determining whether the Project had caused unacceptable impacts on the
sensitive receivers. Analysis of all EM&A data collected throughout the
baseline and the impact periods demonstrated the environmental acceptability of
the Project.
Breaches of Action and Limit Levels
iv. No Action and
Limit Level exceedance was recorded for air quality monitoring and construction
noise monitoring in the reporting period.
v. No Action Level
exceedance but three (3) Limit Level exceedances were recorded for water
quality in the reporting period. It was found that these exceedances were not project-related.
vi. No Action / Limit
exceedance was recorded for noise levels at stations (NMS1 and NMS2) in close proximity to the active ardeid night roosts during the monitoring period.
vii. A total of two (2)
Action Level exceedances were recorded for the ecological monitoring of birds during the reporting period. However,
these exceedances were not project-related.
Land Contamination
viii. Regular site inspection
was carried out to ensure the recommended mitigation measures are properly
implemented. No specific observation associated with land contamination was
identified in the reporting period.
Complaint Log
ix. No complaints were
received in the reporting period.
Notifications of any Summons and Successful Prosecutions
x. No notifications
of summons and prosecutions were received in the reporting period.
Reporting Change
xi. There were no
reporting changes during the reporting period.
2. SUMMARY
OF EM&A REQUIREMENTS AND MONITORING RESULTS
6. ENVIRONMENTAL
COMPLAINT AND NON-COMPLIANCE
7. IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURE
Tables
Table 1.1 – Contact Information of Key Personnel
Table 1.2 – Main Construction Works Carried out in the Reporting
Period
Table 2.1 – Air Quality and Noise Monitoring
Location
Table 2.2 – Coordinates of Water Quality
Monitoring Locations
Table 2.3 – Summary of Water Quality Exceedance
Table 5.1 – Observations and Recommendations of
Site Audit
Table 5.2 – Waste Generated by the Construction
and Disposal Ground
Table 7.1 – Summary of EP Submissions Status
Figures
Figure
1 Location of
Proposed Yuen Long Effluent Polishing Plant
Figure 2 Air
Quality Monitoring Locations
Figure 3 Noise
Monitoring Locations
Appendices